Smart City Fulda: Setting new standards with Intelligent Infrastructure
- Yunex Traffic installed 688 adaptive LED street lights in just three months – reducing energy consumption and CO₂ emissions by up to 79%.
- Smart traffic sensors and digital parking management improve mobility, safety, and urban efficiency.
- Central data platform with real-time dashboard enables transparent, AI-enhanced city management and future-ready scalability.
One of Germany’s largest smart city projects is currently underway in the eastern Hessian city of Fulda. As part of the state program “Promotion of Energy Efficiency and Use of Renewable Energies in Municipalities (Municipal Guideline),” the city was equipped with state-of-the-art technologies in a very short time. The aim is to increase energy efficiency, traffic safety, and quality of life in equal measure. Yunex Traffic was responsible for the overall coordination, managing the project as the general contractor and contributing its expertise in intelligent traffic management.
Within just three months, 688 new LED street lights were installed in Fulda, which adjust their brightness depending on traffic, thus significantly reducing energy consumption and CO₂ emissions. The “star city” paid particular attention to minimizing light pollution.
The project also includes other smart city technologies: traffic sensors for adaptive and dynamic control, digital parking space detection, a variety of IoT sensors for collecting environmental and infrastructure data, and a central data platform. Together, these building blocks form the basis for greater energy efficiency, safety, and quality of life in the city.

The topic of mobility was significantly shaped by Yunex Traffic in Fulda’s Smart City project. Acting as the general contractor, the company coordinated the overall project and contributed its expertise in mobility management. The goal was to deploy modern technologies that would prepare Fulda for the mobility challenges of the future.
A key component was the installation of around 25 smart traffic sensors along major roads. These sensors record traffic flow in real time and provide the data foundation for intelligent street lighting control. Based on the measurements, the lights automatically adjust to current traffic volumes, improving both safety and energy efficiency.
In parallel with the Smart City project, Fulda’s traffic computer system was renewed through a separate tender. The management of traffic lights is now handled by the modernized Yutraffic Symphony, implemented independently of the Smart City initiative. With additional digitalization options and traffic sensors, traffic conditions on major routes are continuously monitored. The traffic-dependent signal plan selection (TASS) uses predefined signal plans and selects the optimal one based on rule-based logic. This allows traffic light operations to be dynamically adjusted and green waves to be optimized.
With the introduction of Yutraffic Symphony, Fulda now has a scalable platform for traffic control and management, specifically designed to address urban traffic challenges holistically. Thanks to its modular structure, the system is future-proof and adaptable to growing demands.
Smart Lighting: 688 New LED Fixtures
The largest individual component of the Fulda project was the replacement of 688 street lights with modern LED systems. This not only introduced energy-efficient technology but also laid the foundation for intelligent, adaptive control. The core element is the iLCS light management system, which can individually control each light in real time and automatically adjust brightness based on traffic volume. This ensures demand-based lighting output, enhancing both safety and energy efficiency.
The adaptive dimming system used in Fulda demonstrates the potential of modern lighting control. Real-time dynamic adjustment of light output allows precise control based on actual road usage. Experience so far indicates potential energy savings of up to 79% compared to conventional lighting systems. In addition to economic benefits, the solution also contributes to reducing CO₂ emissions and supports the city’s sustainability goals.
The project was implemented in collaboration with RhönEnergie Fulda, responsible for replacing the lights, as well as Energiedata 4.0 and EBERO FAB, who integrated the control technology and sensors.
Parking Management and IoT Sensors
Another focus of the project was the digital monitoring of parking spaces. The Center for Digital Development (ZDE) primarily used parking cameras installed around the train station and adjacent streets. Only a few ground sensors were added—where camera-based monitoring was technically not feasible. This setup now enables real-time monitoring of over 200 parking spaces and provides data for future planning.
Additionally, the ZDE was responsible for selecting and installing numerous other IoT sensors—including temperature, soil moisture, black ice, and waste bin fill level sensors. These create a comprehensive data foundation for predictive and sustainable urban management.
To network the multitude of sensors, the ZDE established a city-wide LoRaWAN infrastructure. This energy-efficient radio technology enables reliable and secure transmission of sensor data over long distances with minimal energy consumption.
Central Data Platform and Dashboard
KI-P GmbH will develop and operate Fulda’s central data platform, which will serve as the technical backbone of the project—aggregating, processing, and forwarding data streams to third-party systems as needed. Based on the DIN SPEC 91357 “Reference Architecture Model for Open Urban Platforms,” the platform will be modular and flexibly expandable — allowing new applications, sensors, or entire thematic areas to be seamlessly integrated in the future. By using established standards such as DIN SPEC 91357, consistently applying open-source software, and prioritizing open interfaces, external systems can be connected at any time. This not only ensures future viability but also enables interoperable data exchange between various IT systems and data sources.
A central element will be the dashboard, which will visualize complex and large data sets from lighting, traffic, parking management, environment, and waste in real time. In addition to providing information for various user groups—from citizens to administrative staff—the dashboard will serve as the basis for deeper data analysis, including the use of artificial intelligence. For administrators and decision-makers, this will create an intuitive interface that enables quick responses and well-informed decisions.
Another key aspect will be digital sovereignty: the platform will be operated exclusively on servers located in Germany. This ensures that data is subject to the highest security and privacy standards in accordance with the GDPR. Cities and municipalities will retain full control over their data at all times, without dependence on non-European cloud providers. This will not only strengthen data security but also enhance the municipality’s autonomy and decision-making capabilities in the digital space.
With this approach, Fulda will not only achieve transparency across all Smart City data but also lay the foundation for automated processes and forecasts that extend far beyond the current project.

Dashboard with Real-Time Data from the Central Data Platform
How Fulda is setting new standards with Smart Infrastructure
In a short period of time, the Fulda project has created a model ecosystem for the city of the future. The combination of smart lighting, intelligent traffic control, digital parking management, and a central data platform significantly enhances energy efficiency, safety, and quality of life. Thanks to its modular architecture and open interfaces, the solution remains expandable and provides the foundation for future applications—a model that can serve as an inspiration for other municipalities beyond Fulda.

